Eggersmann Waste-to-Energy Plants

Eggersmann Waste to Energy Plant interior

Client: Eggersmann

Location: Germany, Belgium, Denmark, Latvia, France

Year: 2023–ongoing

Scope:

  • Cable runway and cable tray installations
  • Building and process electrification
  • Safety and instrumentation systems

Description:

Electrical and I&C works across multiple energy-from-waste sites, executed in phases and tailored to each country’s regulatory environment.

    Disney Adventure

    Aerial view of Disney Adventure Cruise

    Client: Meyer Werft

    Location: Wismar, Germany

    Year: 2021, 2023–ongoing

    Scope:

    • Engine room ventilation and electrification
    • Technical zone installations
    • Safety system commissioning

     

    Description:

    Comprehensive electrical and commissioning works carried out during the vessel’s outfitting phase across two build periods, including ventilation, control, and safety systems.

    Hanne Knutsen FSO

    View of Hanne Knutsen FSO

    Location: Gdansk, Poland / Haugesund, Norway

    Year: 2017–2018

    Scope:

    • Control and monitoring system installations and commissioning
    • Process electrification and instrumentation
    • Safety system upgrades and commissioning

    Description:

    Multi-yard electrical and instrumentation works completed for a floating storage and offloading unit, supporting both safety and operational system upgrades.

      Northvolt Battery Factory

      Short of Northvolt battery factory

      Client: ABB / Bilfinger

      Location: Skellefteå, Sweden

      Year: 2023–2024

      Scope:

      • Building and process electrification
      • Instrument cabling, motor and valve connections
      • Cabinet grounding and pneumatics
      • Cold and hot commissioning

      Description:

      Comprehensive electrical and instrumentation package delivered for a Scandinavian greenfield battery production site, scaling from 5 to 25 technicians across critical upstream production areas.